Monday, March 21, 2011

Mid-March Madness

We've been making a lot of progress on things, but the house "look" hasn't changed much in a couple of weeks. I'll post some recent pics soon. In the mean time, we've finalized plans and hired subs for the following.
  • Insulation (ecobatt plus 1 inch spray foam)
  • Drywall (typical)
  • Some finish framing
  • Some of the flooring (HW on main, carpet on bedroom wings, tile in bathrooms)
  • Much of the finish plumbing
In theory, we're ready for rough-in inspections on plumbing and electric next week (fingers crossed). And siding is going up soon...next week?

Insanity.