Monday, May 16, 2011

Totally floored

We've hired a crew to install our hardwood floors (and refinish the ones we saved in the bedroom wing). I think they get started later this week or early next. Floors!

A few more things on the horizon:
- Drywall mudding/taping (this week)
- Bathroom tiling (2 weeks out?)
- Painting
- Trim work
- Carpet
- Stair/landing railings
- Move the kitchen from house 1 to house 2 (yikes!)
Andrew, you have your work cut out for you. That list makes me tired. And frightened. And excited.

Here's a reminder of how beautiful the front of the house is when the sun is shining. Flowering spring tree, sub-contractor vehicles and port-a-john are bonus items. ;-)



Friday, May 13, 2011

Sunny day, sweeping the clouds away...

It's remarkable what some sun and warmth can do for your attitude. Oh, and some brand-spanking new drywall, paint and balcony railing.



Massive progress has been made. We have walls! Walls, people.




Did I mention how nice the house looks when the sun is shining?





Here is a full set of pictures for you to peruse at your leisure: http://www.flickr.com/photos/25768433@N02/sets/72157626686147642/


Wednesday, May 11, 2011

Entry, stairs and drywall progress



Check out how nice our entry looks now -- thanks Greg!

Drywall is going up at breakneck pace, who-hoo!!!


Also, stairs are up. Stair railings are to come.



Sunday, May 8, 2011

I'm not waiting on a lady, I'm just waiting on a friend...

...or a house painter. Due to a combination of slow pace and intermittent rain, our lovely grey-blue has not yet been sprayed on the house. Sigh.

BUT we're getting a balcony railing early next week, and drywall is being delivered Tuesday. Walls, people!


Monday, March 21, 2011

Mid-March Madness

We've been making a lot of progress on things, but the house "look" hasn't changed much in a couple of weeks. I'll post some recent pics soon. In the mean time, we've finalized plans and hired subs for the following.
  • Insulation (ecobatt plus 1 inch spray foam)
  • Drywall (typical)
  • Some finish framing
  • Some of the flooring (HW on main, carpet on bedroom wings, tile in bathrooms)
  • Much of the finish plumbing
In theory, we're ready for rough-in inspections on plumbing and electric next week (fingers crossed). And siding is going up soon...next week?

Insanity.