UPDATED: Hallucinate, Desegregate, Mediate, Alleviate, Insulate


Insulation is proceeding slowly but surely.

Watching the spray-on insulation process is kinda like watching paint dry. Dull and slow.

But, on the plus side, we're likely to have a cozy house as a result.

UPDATE: We passed our insulation inspection. Who-hoo!!!


Sunday, April 24, 2011

Doors, siding & sun

We actually had some sun this weekend. Boy has that been a long time coming...

We have interior doors at the house; a few were hung late week. Siding is almost done. Here's a flickr album that shows some recent pics:


Exterior painting starts tomorrow, as does insulation inside.
Go, go, go!

Sunday, April 10, 2011

We are in over our heads...


Or at least we are craaaazy busy.

Stream-of-consciousness update: windows, siding prep, tile picking, carpet ordering, doorknob picking, electric, plumbing, sinks and bathtubs, hardwood bids, insulation decisions, exterior lighting, interior lighting.

Coming up next: rough-in inspections on electric and plumbing, neighbor open house,
drying out house, insulation, drywall, siding, exterior painting. Oh, we have to pick out exterior paint color(s). Holy moly.

Andrew/Paul/Ryan, thanks for all of your help. We have to be nearing the halfway point, right? ;-)

I've uploaded tons of pictures for you to see the progress. Check it out.


Here's the latest picture taken of the exterior.

Monday, March 21, 2011

Mid-March Madness

We've been making a lot of progress on things, but the house "look" hasn't changed much in a couple of weeks. I'll post some recent pics soon. In the mean time, we've finalized plans and hired subs for the following.
  • Insulation (ecobatt plus 1 inch spray foam)
  • Drywall (typical)
  • Some finish framing
  • Some of the flooring (HW on main, carpet on bedroom wings, tile in bathrooms)
  • Much of the finish plumbing
In theory, we're ready for rough-in inspections on plumbing and electric next week (fingers crossed). And siding is going up soon...next week?